Lasting between one day and three days, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 25 roadworks beginning between Monday, July 20 and Sunday, July 26 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

13. Chapel Lane, New Longton
What: Temporary traffic lights Why: LONGTON V9111 - PON 1429686 - TRAFFIC MANAGEMENT to facilitate BT Openreach Fibre Cabling Works – approx m with no Excavation (BT) When: Jul 24- Jul 28 | Google Maps
.jpeg?trim=0,91,0,91&crop=&width=800)
14. Liverpool Road, Hutton (2)
What: Lane closures Why: : LONGTON V9057 - PON 1431425 - BLOCKAGES – Excavate onto BT ducts for the clearance of duct blockages in to facilitate spine cabling works. (BT) When: Jul 23- Jul 27 | Google Maps

15. Liverpool Road, Longton
What: Temporary traffic lights Why: LONGTON V9111 - PON 1429686 - BLOCKAGES – Excavate onto BT ducts for the clearance of duct blockages in footway and carriageway to facilitate spine cabling works.(BT) When: Jul 24- Jul 28 | Google Maps

16. Leyland Road, Lostock Hall
What: Temporary traffic lights Why: Road crossing required to connect underground duct, bus stop will need to be suspended as part of this permit. 10m CW dig required as well as 1m FW one side of the road and 3m FW the other. (Open Fibre Networks Ltd) When: Jul 24- Jul 29 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

