The £14.7m scheme has seen the road pedestrianised between Marsh Lane and the junction with Ringway, which has itself had a major overhaul.
As the Post reported last week, Friargate South – between Ringway and the Flag Market – is also set for a facelift in a similar mould. So the pictures below show how the entire route could ulimately appear.
![The works are nearly done.](https://www.lep.co.uk/webimg/b25lY21zOmFhNzAwMDFhLWFkMzItNGE3My04MzU1LTE3Y2E5Yjc0N2FmZDo3ZDJmNGFiMS1jNjVlLTRkYzgtOWE1OS1hYzRiZGJhNjc2YzI=.jpg?crop=3:2&width=800)
4 / 4