Lasting between one day and one month, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 126 roadworks beginning between Monday, January 13 and Sunday, January 19, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:

21. Fox Lane, Leyland
What: Stop / Go boards Why: Surface dressing patching works When: Jan 13-Jan 15 | Google Maps

22. Edith Rigby Way, Preston
What: Lane closure Why: Road Space Licence for surfacing remedial works as part of the PWDR on Edith Rigby Way, Preston, Southbound on approach to Savick Book. Lane 1 closure to carry out footpath surfacing works. When: Jan 14-Jan 17 | Google Maps
![What: Lane closure
Why: [Statutory infrastructure works] Access a CW chamber for splicing activities on behalf of Vodafone
When: Jan 15-Jan 16](https://www.thestar.co.uk/jpim-static/image/2025/01/10/15/35/Riversway-Preston.jpeg?crop=4:3&trim=&width=800)
23. Riversway, Preston
What: Lane closure Why: [Statutory infrastructure works] Access a CW chamber for splicing activities on behalf of Vodafone When: Jan 15-Jan 16 | Google Maps
![What: Stop / Go boards
Why: [New service connection] Excavate large joint bay (approx 8mx2m) in the footway to disconnect and remove old link box, and to install and joint cables for new link box installation.
When: Jan 15-Jan 21](https://www.thestar.co.uk/jpim-static/image/2025/01/10/16/57/Station-Road-Bamber-Bridge.jpeg?crop=4:3&trim=&width=793)
24. Station Road, Bamber Bridge
What: Stop / Go boards Why: [New service connection] Excavate large joint bay (approx 8mx2m) in the footway to disconnect and remove old link box, and to install and joint cables for new link box installation. When: Jan 15-Jan 21 | Google Maps


