Lasting between one day and one month, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 126 roadworks beginning between Monday, January 13 and Sunday, January 19, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:

17. Dever Road, Leyland
What: Road closure Why: Carriageway surface dressing patching works. works in conjunction with the western drive scheme. When: Jan 13-Jan 21 | Google Maps
![What: Multi-way signals
Why: [New service connection] To Install 2 x Short sided 25mm PE New water Connection to the 160mm PE Main
When: Jan 13-Jan 15](https://www.thestar.co.uk/jpim-static/image/2025/01/10/15/17/Leyland-Road-Penwortham.jpeg?crop=4:3&trim=&width=800)
18. Leyland Road, Penwortham
What: Multi-way signals Why: [New service connection] To Install 2 x Short sided 25mm PE New water Connection to the 160mm PE Main When: Jan 13-Jan 15 | Google Maps
![What: Multi-way signals
Why: [New service connection] Excavate to standard depth open cut in footway for a LV Pole Top Term Change followed by a permanent reinstatement. Mulitway Lights required for pedestrian provisions, a grab wagon and reinstatement support vehicles.
When: Jan 13-Jan 17](https://www.thestar.co.uk/jpim-static/image/2025/01/10/15/37/Long-Moss-Lane-Whitestake.jpeg?crop=4:3&trim=&width=800)
19. Long Moss Lane, Whitestake
What: Multi-way signals Why: [New service connection] Excavate to standard depth open cut in footway for a LV Pole Top Term Change followed by a permanent reinstatement. Mulitway Lights required for pedestrian provisions, a grab wagon and reinstatement support vehicles. When: Jan 13-Jan 17 | Google Maps
![What: Multi-way signals
Why: [New service connection] Excavate to standard depth open cut in footway for a LV Pole Top Term Change followed by a permanent reinstatement. Mulitway Lights required for pedestrian provisions, a grab wagon and reinstatement support vehicles.
When: Jan 13-Jan 17](https://www.thestar.co.uk/jpim-static/image/2025/01/10/15/22/Sheephill-Lane-New-Longton.jpeg?crop=4:3&trim=&width=800)
20. Sheephill Lane, New Longton
What: Multi-way signals Why: [New service connection] Excavate to standard depth open cut in footway for a LV Pole Top Term Change followed by a permanent reinstatement. Mulitway Lights required for pedestrian provisions, a grab wagon and reinstatement support vehicles. When: Jan 13-Jan 17 | Google Maps


