Lasting between one day and two weeks, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
We have only listed the roadworks beginning between Monday, November 11 and Sunday, November 17 that involve closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Multi-way signals
Why: [Disconnection or alteration of supply] Need to Re-Dig And Locate 9" SL MAIN and then To Install 1x Short sided Connection and to disconnect the old lead supply
When: Nov 16-Nov 17](https://www.thestar.co.uk/jpim-static/image/2024/11/09/14/14/Liverpool-Road-Hutton.jpeg?crop=4:3&trim=&width=800)
9. Liverpool Road, Hutton
What: Multi-way signals Why: [Disconnection or alteration of supply] Need to Re-Dig And Locate 9" SL MAIN and then To Install 1x Short sided Connection and to disconnect the old lead supply When: Nov 16-Nov 17 | Google Maps


