Lasting between one day and one month, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 104 roadworks beginning between Monday, February 17 and Sunday, February 22, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Multi-way signals
Why: [Utility asset works] Replace 15m gas main with associated services and connections
When: Feb 17- Feb 28](https://www.thestar.co.uk/jpim-static/image/2025/02/14/14/38/Church-Road-Leyland.jpeg?crop=4:3&trim=&width=800)
13. Church Road, Leyland
What: Multi-way signals Why: [Utility asset works] Replace 15m gas main with associated services and connections When: Feb 17- Feb 28 | Google Maps
![What: Road closure
Why: [New service connection] To Install 1 x Long sided 25mm PE Temp Supply Water connection to the 110mm PE Main
When: Feb 17- Feb 19](https://www.thestar.co.uk/jpim-static/image/2025/02/14/14/28/Marsh-Lane-Longton.jpeg?crop=4:3&trim=&width=800)
14. Marsh Lane, Longton
What: Road closure Why: [New service connection] To Install 1 x Long sided 25mm PE Temp Supply Water connection to the 110mm PE Main When: Feb 17- Feb 19 | Google Maps
![What: Multi-way signals
Why: [New service connection] Excavate joint bays with 25m of track to install and joint cable for new connection to the school. School are aware of works.
When: Feb 17- Feb 23](https://www.thestar.co.uk/jpim-static/image/2025/02/14/14/51/Peacock-Hall-Road-Leyland.jpeg?crop=4:3&trim=&width=800)
15. Peacock Hall Road, Leyland
What: Multi-way signals Why: [New service connection] Excavate joint bays with 25m of track to install and joint cable for new connection to the school. School are aware of works. When: Feb 17- Feb 23 | Google Maps
![What: Multi-way signals
Why: [New service connection] Excavate joint bays with 25m of track to install and joint cable for new connection to the school.
When: Feb 17- Feb 23](https://www.thestar.co.uk/jpim-static/image/2025/02/14/14/36/Meadowcroft-Road-Leyland.jpeg?crop=4:3&trim=&width=800)
16. Meadowcroft Road, Leyland
What: Multi-way signals Why: [New service connection] Excavate joint bays with 25m of track to install and joint cable for new connection to the school. When: Feb 17- Feb 23 | Google Maps


