Lasting between one day and two weeks, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 61 roadworks beginning between Monday, April 1 and Sunday, April 7, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
1. Preston roadworks
Preston roadworks between Monday, April 1 and Sunday, April 7. | Neil Cross
![What: Multi-way signals
Why: Private works under Section 50 Licence, carried out by Dewhurst Utility Services to DUSL to excavate Place 63mm PE80 Barrier pipe across site entrance and provide Temp Wash Out at Y1 for UU to Undertake end connection at a later date X1-Y1on water design.
When: Apr 2-Apr 15](https://www.thestar.co.uk/jpim-static/image/2024/03/29/11/06/t.jpg?crop=3:2&trim=&width=800)
2. Tulketh Brow, Preston (1)
What: Multi-way signals Why: Private works under Section 50 Licence, carried out by Dewhurst Utility Services to DUSL to excavate Place 63mm PE80 Barrier pipe across site entrance and provide Temp Wash Out at Y1 for UU to Undertake end connection at a later date X1-Y1on water design. When: Apr 2-Apr 15 | Google Maps
![What: Multi-way signals
Why: Private works under Section 50 licence, carried out by Dewhurst Utility Services to DUSL To excavate joint bay area approx. 4.0mtr x 2.0mtr and breech Joint 3c 300 SAC XC LV Cable off Existing 4c 3 SAC LV Cable and lay to boundary to straight joint 300/95.
When: Apr 2-Apr 15](https://www.thestar.co.uk/jpim-static/image/2024/03/29/11/06/t.jpg?crop=3:2&trim=&width=800)
3. Tulketh Brow, Preston (2)
What: Multi-way signals Why: Private works under Section 50 licence, carried out by Dewhurst Utility Services to DUSL To excavate joint bay area approx. 4.0mtr x 2.0mtr and breech Joint 3c 300 SAC XC LV Cable off Existing 4c 3 SAC LV Cable and lay to boundary to straight joint 300/95. When: Apr 2-Apr 15 | Google Maps
![What: Multi-way signals
Why: Private works under Section 50 licence, carried out by Dewhurst Utility Services to DUSL To excavate Joint Bay approx 2.0mtr x 1.0mtr, and carry out 90mm PE Off existing 125mm PE ( in 6� Cast Iron ) using a Branch Saddle Connection with 80mm FIG158 Valve.
When: Apr 2-Apr 15](https://www.thestar.co.uk/jpim-static/image/2024/03/29/11/06/t.jpg?crop=3:2&trim=&width=800)
4. Tulketh Brow, Preston (3)
What: Multi-way signals Why: Private works under Section 50 licence, carried out by Dewhurst Utility Services to DUSL To excavate Joint Bay approx 2.0mtr x 1.0mtr, and carry out 90mm PE Off existing 125mm PE ( in 6� Cast Iron ) using a Branch Saddle Connection with 80mm FIG158 Valve. When: Apr 2-Apr 15 | Google Maps