Lasting between one day and four months, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 95 roadworks beginning between Monday, October 21 and Sunday, October 28, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Two-way signals
Why: [Utility repair and maintenance works] Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour.
When: Oct 23-Oct 24](https://www.thestar.co.uk/jpim-static/image/2024/10/20/9/51/Chorley-Road-Bamber-Bridge-(2).jpeg?crop=4:3&trim=&width=800)
25. Chorley Road, Bamber Bridge (2)
What: Two-way signals Why: [Utility repair and maintenance works] Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour. When: Oct 23-Oct 24 | Google Maps
![What: Multi-way signals
Why: [Utility repair and maintenance works] Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour.
When: Oct 23-Oct 24](https://www.thestar.co.uk/jpim-static/image/2024/10/20/9/53/Cuerdale-Lane-Walton-le-Deal.jpeg?crop=4:3&trim=&width=800)
26. Cuerdale Lane, Walton-le-Deal
What: Multi-way signals Why: [Utility repair and maintenance works] Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour. When: Oct 23-Oct 24 | Google Maps
![What: Two-way signals
Why: [Disconnection or alteration of supply] To Install 1x Short sided Connection and to disconnect the old lead supply (REJOIN)
When: Oct 24-Oct 25](https://www.thestar.co.uk/jpim-static/image/2024/10/20/9/48/Garstang-Road-Preston.jpeg?crop=4:3&trim=&width=800)
27. Garstang Road, Preston
What: Two-way signals Why: [Disconnection or alteration of supply] To Install 1x Short sided Connection and to disconnect the old lead supply (REJOIN) When: Oct 24-Oct 25 | Google Maps
![What: Multi-way signals
Why: [Utility asset works] Approx 110m Gas Mains Replacement with 14 associated services and connections
When: Oct 24-Nov 15](https://www.thestar.co.uk/jpim-static/image/2024/10/20/10/15/Oakwood-Avenue-Walton-le-Dale.jpeg?crop=4:3&trim=&width=800)
28. Oakwood Avenue, Walton-le-Dale
What: Multi-way signals Why: [Utility asset works] Approx 110m Gas Mains Replacement with 14 associated services and connections When: Oct 24-Nov 15 | Google Maps


