Lasting between one day and one month, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 64 roadworks beginning between Monday, August 4 and Sunday, August 10, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Road closure
Why: [New service connection] To install a NAV Branch & Bypass
When: Aug 4-Aug 22](https://www.thestar.co.uk/jpim-static/image/2025/08/01/11/39/Goosnargh-Lane-Goosnargh.jpeg?crop=4:3&trim=&width=800)
5. Goosnargh Lane, Goosnargh
What: Road closure Why: [New service connection] To install a NAV Branch & Bypass When: Aug 4-Aug 22 | Google Maps
![What: Road closure
Why: [Utility asset works] To build new joint box in FW.
When: Aug 4-Aug 8](https://www.thestar.co.uk/jpim-static/image/2025/08/01/11/45/Station-Lane-Barton.jpeg?crop=4:3&trim=&width=800)
6. Station Lane, Barton
What: Road closure Why: [Utility asset works] To build new joint box in FW. When: Aug 4-Aug 8 | Google Maps
![What: Multi-way signals
Why: [New service connection] Excavate joint bay with approximately 2800m of tracker in carriageway to install new HV connections to sub stations
When: Aug 4-Sep 7](https://www.thestar.co.uk/jpim-static/image/2025/08/01/11/15/Lightfoot-Lane-Fulwood.jpeg?crop=4:3&trim=&width=800)
7. Lightfoot Lane, Fulwood
What: Multi-way signals Why: [New service connection] Excavate joint bay with approximately 2800m of tracker in carriageway to install new HV connections to sub stations When: Aug 4-Sep 7 | Google Maps
![What: Multi-way signals
Why: [Highway repair and maintenance works] Recut signal detector loops on Longridge Road south of crematorium access under 3-way temporary signals
When: Aug 4-Aug 4](https://www.thestar.co.uk/jpim-static/image/2025/08/01/11/00/Longridge-Road-Preston.jpeg?crop=4:3&trim=&width=800)
8. Longridge Road, Preston
What: Multi-way signals Why: [Highway repair and maintenance works] Recut signal detector loops on Longridge Road south of crematorium access under 3-way temporary signals When: Aug 4-Aug 4 | Google Maps


