Swing Bridge at Preston Docks to close from tomorrow for repair works
The swing bridge at Preston Docks will close tomorrow to allow works to be carried out.
The swing bridge on Navigation Way at Riversway will be closed from 9am Tuesday from 3pm until Friday, March 27.


Works carreid out during the closurewill include:
Surface repairs.
Electrical and mechanical testing.
Test swings of the bridge powered by our back-up generator.
Maintenance of the approach barriers to the bridge and warning wig-wags.
Power washing and painting as required.
Alternative routes to the swing bridge closure are via Navigation Way, Mariners Way, Port Way.
