Storm-damaged Lancashire village road set to close for good
A stretch of road in rural Wyre, which has been shut for almost six years after being damaged in a storm, looks set to be permanently closed to traffic.
Part of Walmsley Bridge Lane, in Claughton-on- Brock, slipped from its foundations after the area was hit by Storm Ciara back in February 2020.
Around 25 metres of the single-file route, close to a bridge over River Brock, was later deemed unsafe for motor vehicles and has been blocked off ever since.
Now, Lancashire County Council highways bosses have proposed introducing a ‘prohibition of driving’ order that would close the section of road for good to motorised traffic.


The stretch – on the southern side of the bridge, just under half a mile south of the junction with May Lane – would, however, remain open to cyclists, pedestrians and horseriders.
In documents setting out the plans, the authority says “timber post and rail fencing” would be installed adjacent to the landslip location, with signage put in place to give advance notice to motorists.
The rest of Walmsley Bridge Lane, which runs between May Lane and Scotch Green Lane, would be unaffected by the order – but would never return to being the through-route it was until 2020.
County Hall says the “risk to public safety will be reduced” by the planned move.
A public consultation has opened into the change. Anybody wishing to take part should email:
[email protected], quoting ref:LSG4\894.21668\AFR, by 18th February, or write to: The Director of Law and Governance, Lancashire County Council, PO Box 100, County Hall, Preston PR1 0LD.