Lasting between one day and two weeks, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 71 roadworks beginning in Chorley between Monday, August 10 and Sunday, August 16 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

9. Bolton Road, Withnell
What: Lane closures Why: Structural inspections (National Highways) When: Aug 10- Aug 11 | Google Maps

10. Blackburn New Road, Wheelton
What: Temporary traffic tights Why: PERMIT FOR 2 WAY LIGHTS - ASV TANKERS FOR ON GOING WORKS ON WHINS LANE (United Utilities Water) When: Aug 11- Aug 14 | Google Maps

11. Ulnes Walton Lane, Chorley
What: Temporary traffic tights Why: Lifting lid on manhole, cleaning and photographing the asset, closing the manhole. (United Utilities Water) When: Aug 13- Aug 13 | Google Maps
.jpeg?trim=0,56,0,56&crop=&width=800)
12. Ulnes Walton Lane, Chorley (2)
What: Temporary traffic tights Why: Lifting lid on manhole, cleaning and photographing the asset, closing the manhole. (United Utilities Water) When: Aug 13- Aug 13 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

