Lasting between one day and four month, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 29 roadworks beginning between Monday, August 12 and Sunday, August 18, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Multi-way signals
Why: [Utility asset works] Erect new wooden pole
When: Aug 13-Aug 14](https://www.thestar.co.uk/jpim-static/image/2024/08/12/7/04/Bournes-Row-Walton-le-Dale.jpg?crop=4:3&trim=&width=800)
9. Bourne's Row, Walton-le-Dale
What: Multi-way signals Why: [Utility asset works] Erect new wooden pole When: Aug 13-Aug 14 | Google Maps
![What: Multi-way signals
Why: [Utility asset works] Pole Provide
When: Aug 13-Aug 14](https://www.thestar.co.uk/jpim-static/image/2024/08/12/7/32/Fox-Lane-Walton-le-Dale.jpg?crop=4:3&trim=&width=772)
10. Fox Lane, Walton-le-Dale
What: Multi-way signals Why: [Utility asset works] Pole Provide When: Aug 13-Aug 14 | Google Maps
![What: Two-way signals
Why: [Utility repair and maintenance works] REPAIR AND RENEW DAMAGED FRAME AND COVER IN THE F/W
When: Aug 13-Aug 14](https://www.thestar.co.uk/jpim-static/image/2024/08/12/7/32/Gill-Lane-Little-Hoole.jpg?crop=4:3&trim=&width=800)
11. Gill Lane, Little Hoole
What: Two-way signals Why: [Utility repair and maintenance works] REPAIR AND RENEW DAMAGED FRAME AND COVER IN THE F/W When: Aug 13-Aug 14 | Google Maps
![What: Multi-way signals
Why: [Utility asset works] HOGHTON V8006 - PON 1159897 - Overlay - Lay approx 2m of Duct 54/56 in Footway to link existing BT Boxes to facilitate spine cabling works.
When: Aug 14-Aug 16](https://www.thestar.co.uk/jpim-static/image/2024/08/12/8/57/Hoghton-Lane-Walton-le-Dale.jpg?crop=4:3&trim=&width=784)
12. Hoghton Lane, Walton-le-Dale
What: Multi-way signals Why: [Utility asset works] HOGHTON V8006 - PON 1159897 - Overlay - Lay approx 2m of Duct 54/56 in Footway to link existing BT Boxes to facilitate spine cabling works. When: Aug 14-Aug 16 | Google Maps


