Lasting between one day and three days, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 53 roadworks beginning between Monday, July 27 and Sunday, August 2 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

13. Avon Bridge, Fulwood
What: Temporary traffic lights Why: Excavate joint bay with track in the footway and carriageway to install and joint cable for new connection to car charging point located on private land. (Electricity North West Limited) When: Jul 28- Jul 30 | Google Maps

14. Station Lane, Barton
What: Temporary traffic lights Why: Fell dead Ash tree near the junction 3 Way traffic lights needed to ensure safe passage of vehicles and pedestrians. (Lancashire County Council) When: Jul 30- Jul 30 | Google Maps
.jpeg?trim=0,87,0,87&crop=&width=800)
15. Durton Lane, Preston (2)
What: Temporary traffic lights Why: BROUGHTON LANCASHIRE V9064 - PON 1380933 - BLOCKAGES – Excavate onto BT ducts for the clearance of duct blockages in footway, carriageway to facilitate spine cabling works. (BT) When: Jul 31- Aug 4 | Google Maps
.jpeg?trim=0,96,0,96&crop=&width=800)
16. Mericourt Road, Preston (2)
What: Temporary traffic lights Why: BROUGHTON LANCASHIRE V9064 - PON 1380933 - TRAFFIC MANAGEMENT to facilitate BT Openreach Fibre Cabling Works in footway with no Excavation(BT) When: Jul 31- Aug 4 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

