Lasting between one day and one month, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 62 roadworks beginning between Monday, August 17 and Sunday, August 23 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

5. Woodale Road, Clayton-le-Woods,
What: Temporary traffic lights Why: Excavate joint bay with approx. 35 meters of track in the verge to install and joint cable for new connection. (Electricity North West Limited) When: Aug 17-Aug 29 | Google Maps

6. New Street, Mawdesley
What: Temporary traffic lights Why: BLOCKAGES – Excavate onto BT ducts for the clearance of 2X duct blockages in FW to facilitate spine cabling works. (BT) When: Aug 17-Aug 20 | Google Maps

7. Southport Road, Chorley
What: Temporary traffic lights Why: Repair a defective carriageway frame and cover on behalf of Vodafone (Vodafone Group) When: Aug 17-Aug 20 | Google Maps

8. Wigan Road, Clayton-le-Woods
What: Temporary traffic lights Why: Excavate in footway and carriageway for new service connection, 2 way lights and 2 bus stop suspensions, all activities to be carried out from within TM, store spoil within barriers. (Electricity North West Limited) When: Aug 17-Aug 22 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

