Lasting between one day and one month , motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 48 roadworks beginning between Monday, July 6 and Sunday, July 12 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long they are expected to last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s log.

5. Sandy Lane, Brindle
What: Temporary traffic lights Why: Permit to survey and inspect air valve (United Utilities Water) When: Jul 6- Jul 6 | Google Maps

6. Smithy Lane, Mawdesley
What: Temporary traffic lights Why: Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour. (United Utilities Water) When: Jul 6- Jul 7 | Google Maps

7. Black Moor Road, Mawdesley
What: Temporary traffic lights Why: Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour. (United Utilities Water) When: Jul 6- Jul 7 | Google Maps

8. Wigan Road, Euxton
What: Temporary traffic lights Why: 1x Long sided disconnection of old lead supply and replace with new water connection (United Utilities Water) When: Jul 7- Jul 11 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

