Lasting between one day and two weeks, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 101 roadworks beginning between Monday January 27and Sunday, February 2, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Multi-way signals
Why: [New service connection] Excavate large joint bay (approx 8mx2m) in the footway and verge to disconnect and remove old link box, and to install and joint cables for new link box installation.
When: Jan 29-Feb 4](https://www.thestar.co.uk/jpim-static/image/2025/01/24/12/55/Broadfield-Drive-Leyland.jpeg?crop=4:3&trim=&width=800)
13. Broadfield Drive, Leyland
What: Multi-way signals Why: [New service connection] Excavate large joint bay (approx 8mx2m) in the footway and verge to disconnect and remove old link box, and to install and joint cables for new link box installation. When: Jan 29-Feb 4 | Google Maps
![What: Multi-way signals
Why: [Utility repair and maintenance works] PRESTON LANCASHIRE Spine C 1212557 - BLOCKAGES - Excavate onto BT ducts for the clearance of duct blockages in Footway/carriageway to facilitate spine cabling works.
When: Jan 29-Jan 31](https://www.thestar.co.uk/jpim-static/image/2025/01/24/12/41/Cop-Lane-Penwortham.jpeg?crop=4:3&trim=&width=800)
14. Cop Lane, Penwortham
What: Multi-way signals Why: [Utility repair and maintenance works] PRESTON LANCASHIRE Spine C 1212557 - BLOCKAGES - Excavate onto BT ducts for the clearance of duct blockages in Footway/carriageway to facilitate spine cabling works. When: Jan 29-Jan 31 | Google Maps
![What: Multi-way signals
Why: [Utility repair and maintenance works] PRESTON LANCASHIRE Spine C 1212557 - BLOCKAGES - Excavate onto BT ducts for the clearance of duct blockages in Footway/carriageway to facilitate spine cabling works.
When: Jan 29-Jan 31](https://www.thestar.co.uk/jpim-static/image/2025/01/24/12/02/Broad-Oak-Lane-Penwortham.jpeg?crop=4:3&trim=&width=800)
15. Broad Oak Lane, Penwortham
What: Multi-way signals Why: [Utility repair and maintenance works] PRESTON LANCASHIRE Spine C 1212557 - BLOCKAGES - Excavate onto BT ducts for the clearance of duct blockages in Footway/carriageway to facilitate spine cabling works. When: Jan 29-Jan 31 | Google Maps
![What: Multi-way signals
Why: [Utility repair and maintenance works] Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour.
When: Jan 30-Jan 31](https://www.thestar.co.uk/jpim-static/image/2025/01/24/12/11/Ribbleton-Avenue-Preston.jpeg?crop=4:3&trim=&width=800)
16. Ribbleton Avenue, Preston
What: Multi-way signals Why: [Utility repair and maintenance works] Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour. When: Jan 30-Jan 31 | Google Maps


