Lasting between one day and two months, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 91 roadworks beginning between Monday, August 31 and Sunday, September 6 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks in South Ribble you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

21. Chain House Lane, Whitestake
What: Temporary traffic lights Why: To build new joint box and lay approx 5m of duct in FW/VERGE (BT) When: Sep 2- Sep 5 | Google Maps
.jpeg?trim=0,101,0,101&crop=&width=800)
22. Croston Road, Farington Moss (2)
What: Temporary traffic lights Why: To undertake survey of Openreach chamber, NO excavation (IX Wireless Limited) When: Sep 2- Sep 5 | Google Maps
.jpeg?trim=0,63,0,63&crop=&width=732)
23. Brierley Road, Bamber Bridge (3)
What: Temporary traffic lights Why: Excavate joint bay with approx. 18meters of track in the footway/carriageway/verge to install and joint cable for new connection (Electricity North West Limited) When: Sep 3- Sep 17 | Google Maps
.jpeg?trim=0,139,0,139&crop=&width=800)
24. Liverpool Old Road, Much Hoole (2)
What: Temporary traffic lights Why: 14M NEW DUCT IN SOFT TO BT TELEGRAPH POLE (BT) When: Sep 3- Sep 7 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

