Lasting between one day and one week, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 67 roadworks beginning between Monday, November 2 and Sunday, November 8 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of in Preston this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.
.jpeg?trim=0,60,0,60&crop=&width=800)
1. Preston roadworks (2/11-8/11)
All the major roadworks starting in Preston between Monday, November 2 and Sunday, November 8 | Google Maps

2. Tower Green, Fulwood
What: Road closed Why: Excavate joint bay with approximately 8.57 metres of track in the footway, carriageway and verge to install and joint cable for new connection to property. (Electricity North West Limited) When: Nov 2- Nov 6 | Google Maps

3. Whittingham Lane, Goosnargh
What: Temporary traffic lights Why: Excavate joint bay with approximately 8.57 metres of track in the footway, carriageway and verge to install and joint cable for new connection to property. (Electricity North West Limited) When: Nov 2- Nov 5 | Google Maps

4. Rose Terrace, Preston
What: Road closed Why: Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour. (United Utilities Water) When: Nov 2- Nov 6 | Google Maps
