Lasting between one day and two weeks, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 67 roadworks beginning between Monday, October 19 and Sunday, October 25 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of in Preston this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

5. Mariners Way, Preston
What: Temporary traffic lights Why: ROUTINE MAINTENANCE OF SEWER NETWORK ON BEHALF OF UNITED UTILITIES (United Utilities Water) When: Oct 19-Oct 20 | Google Maps

6. Goosnargh Lane, Goosnargh
What: Road closed Why: Excavate joint bay with approx. 40 meters of track in the carriageway/verge to install and joint cable for new LV connection. (Electricity North West Limited) When: Oct 19-Oct 26 | Google Maps

7. Preston Road, Grimsargh
What: Temporary traffic lights Why: Overlay – Lay approx 20m of duct in FW/CW to link existing BT boxes to facilitate spine cabling works. (BT) When: Oct 19-Oct 20 | Google Maps

8. Crooked Lane, Preston D
What: Road closed Why: Excavate in footway/carriageway for electric lay and POC connection for ne development, backfill and reinstate (Global Utility Connections) When: Oct 19-Oct 30 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

