Lasting between one day and two weeks, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 53 roadworks beginning between Monday, September 14 and Sunday, September 20 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks in Preston you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

9. Sandy Lane, Lower Bartle
What: Temporary traffic lights Why: Overlay – Lay approx 58m of duct in FW/VERGE to link existing BT boxes to facilitate spine cabling works. (BT) When: Sep 16- Sep 24 | Google Maps

10. Church Street, Preston
What: Lane closures Why: Open cut excavation required to reset frame and cover in the carriageway (United Utilities Water) When: Sep 17- Sep 18 | Google Maps

11. St Vincents Road, Fulwood
What: Temporary traffic lights Why: TM for arborists to trim trees which prevent telecoms mast from being swapped (Cornerstone Telecommunications Infrastru) When: Sep 18- Sep 18 | Google Maps

12. Longridge Road, Preston
What: Temporary traffic lights Why: Overlay – Lay approx 5m of duct in CW to link existing BT boxes to facilitate spine cabling works. (BT) When: Sep 19- Sep 21 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

