Lasting between one day and six weeks, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 45 roadworks beginning between Monday, August 31 and Sunday, September 6 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks in Preston you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

13. Bartle Lane, Lower Bartle
What: Temporary traffic lights Why: Excavate joint bay with approx. 40 meters of track in the carriageway to install and joint cable for new connection. (Electricity North West Limited) When: Sep 3- Sep 7 | Google Maps

14. Black Bull Lane, Fulwood
What: Temporary traffic lights Why: 1x Short sided disconnection of old lead supply and replace with new water connection (United Utilities Water) When: Sep 6- Sep 7 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

