Lasting between one day and three weeks, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 116 roadworks beginning between Monday, November 2 and Sunday, November 8 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of in Chorley and South Ribble this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

25. Brindle Road, Bamber Bridge
What: Temporary traffic lights Why: Reduction agreed to rework 10mm to take out depression, then overband full reinstatement afterwards to seal. Rework 10mm 1.2m x 1m to level with existing and then 10m of overband to fully seal edges. (United Utilities Water) When: Nov 5- Nov 6 | Google Maps

26. Regent Street, Coppull
What: Temporary traffic lights Why: Replace approx. 200m of gas mains and associated services (Cadent) When: Nov 6- Nov 26 | Google Maps

27. Chapel Lane, Wheelton
What: Temporary traffic lights Why: 2 way lights required for vegetation works around our overhead lines (Electricity North West Limited) When: Nov 6- Nov 6 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

