Lasting between one day and two weeks, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 43 roadworks beginning between Monday, August 31 and Sunday, September 6 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks in Chorley you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.
.jpeg?trim=0,60,0,60&crop=&width=800)
1. Chorley roadworks (31/8-6/9)
All the major roadworks starting in Chorley bewteen Monday, August 31 and Sunday, September 6 | Google Maps

2. Dole Lane, Withnell
What: Temporary traffic lights Why: Renew, replace, raise and lower Frame and Cover Carriageway No. 2 (BT) When: Aug 31- Sep 3 | Google Maps

3. Shepherds Way, Chorley
What: Lane closures Why: Excavate joint bay with approx. 140 meters of track in the footway/carriageway to install and joint cable for LV mains lay and disconnection (Electricity North West Limited) When: Sep 1- Sep 15 | Google Maps

4. Back Lane, Clayton-le-Woods
What: Temporary traffic lights Why: Open cut excavation required to reset frame and cover in the carriageway (United Utilities Water) When: Sep 1- Sep 2 | Google Maps
