Lasting between one day and three weeks, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 63 roadworks beginning between Monday, November 16 and Sunday, November 22 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks in South Ribble you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

9. Watkin Lane, Lostock Hall
What: Temporary traffic lights Why: Maintenance of a flow monitor. No excavation. Works to take no more than 1 hour. (United Utilities Water) When: Nov 16- Nov 17 | Google Maps

10. Gill Lane, Longton
What: Temporary traffic lights Why: Works to centralise location of hydrant in the chamber (United Utilities Water) When: Nov 17- Nov 19 | Google Maps

11. Spring Lane, Samlesbury Spring Lane, Samlesbury
What: Temporary traffic lights Why: Excavate to replace existing water main with new main using open cut method of practice (United Utilities Water) When: Nov 17- Nov 30 | Google Maps

12. Brindle Road, Bamber Bridge
What: Temporary traffic lights Why: Excavation and traffic management to facilitate the replacement of overhead electrical poles and associated conductors & cables. Works include removal of existing infrastructure, installation of new poles and cables, and excavation at pole bases and cable termination points. Temporary traffic controls will be implemented to ensure safe working conditions for operatives and the public. Once completed, the works will be backfilled & reinstated where required.(Electricity North West Limited) When: Nov 17- Nov 19 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

