Lasting between one day and three weeks, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 53 roadworks beginning between Monday, November 9 and Sunday, November 15 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks in South Ribble you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

5. Todd Lane South, Lostock Hall
What: Temporary traffic lights Why: Excavate in footway / carriageway to install PMV, Meter and strainer. (United Utilities Water) When: Nov 9- Nov 27 | Google Maps

6. Turpin Green Lane, Leyland
What: Temporary traffic lights Why: Private Works issued under Road Space Allocation Licence, carried out by chevrontm. Manhole surveying with in the carriageway, works to be completed within 2 hours or less. (Lancashire County Council) When: Nov 9- Nov 9 | Google Maps

7. Service road side of 40 Bow Lane, Leyland
What: Temporary traffic lights Why: Excavate joint bay with approximately 60 metres of track to install hv cables (Electricity North West Limited) When: Nov 9- Nov 20 | Google Maps

8. Gill Lane, Walmber Bridge
What: Temporary traffic lights Why: Mains renewal of existing poor condition main (United Utilities Water) When: Nov 9- Nov 20 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

