Lasting between one day and one month, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 72 roadworks beginning between Monday, July 7 and Sunday, July 13, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Two-way signals
Why: [Statutory infrastructure works] Uninstallation and installation of telegraph poles carrying fibre cables.
When: July 8-July 10](https://www.thestar.co.uk/jpim-static/image/2025/07/04/15/34/Eldon-Street-Preston.jpeg?crop=4:3&trim=&width=800)
9. Eldon Street, Preston
What: Two-way signals Why: [Statutory infrastructure works] Uninstallation and installation of telegraph poles carrying fibre cables. When: July 8-July 10 | Google Maps
![What: Two-way signals
Why: [New service connection] NEW GAS SERVICE CONNECTION REQUIRED - EXCAVATION OF 8M WILL BE IN PUBLIC FOOTWAY / CARRIAGEWAY
When: July 8-July 11](https://www.thestar.co.uk/jpim-static/image/2025/07/04/15/55/Whittingham-Lane-Goosnargh.jpeg?crop=4:3&trim=&width=800)
10. Whittingham Lane, Goosnargh
What: Two-way signals Why: [New service connection] NEW GAS SERVICE CONNECTION REQUIRED - EXCAVATION OF 8M WILL BE IN PUBLIC FOOTWAY / CARRIAGEWAY When: July 8-July 11 | Google Maps
![What: Road closure
Why: [New service connection] Excavate joint bay in footway to install and joint cable for new 3ph cross side connection to business.
When: July 9-July 15](https://www.thestar.co.uk/jpim-static/image/2025/07/04/15/41/Clarendon-Street-Preston.jpeg?crop=4:3&trim=&width=800)
11. Clarendon Street, Preston
What: Road closure Why: [New service connection] Excavate joint bay in footway to install and joint cable for new 3ph cross side connection to business. When: July 9-July 15 | Google Maps
![What: Road closure
Why: [New service connection] Excavate joint bay with approximately 2800m of tracker in carriageway to install new HV connections to sub stations
When: July 9-Aug 5](https://www.thestar.co.uk/jpim-static/image/2025/07/04/15/38/Bartle-Lane-Woodplumpton.jpeg?crop=4:3&trim=&width=800)
12. Bartle Lane, Woodplumpton
What: Road closure Why: [New service connection] Excavate joint bay with approximately 2800m of tracker in carriageway to install new HV connections to sub stations When: July 9-Aug 5 | Google Maps