Lasting between one day and one month, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 59 roadworks beginning between Monday, October 26 and Sunday, November 1 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of in Preston this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

5. West Cliff Terrace, Preston
What: Road closed Why: Work Details / Remit - There are mature trees growing from the wall causing root action. Missing brickwork and spalling has been reported to the retaining portion of the wall. These works are to co-inside with line blocks. 08:00 - 17:00 (Network Rail Infrastructure Ltd) When: Oct 26-Oct 30 | Google Maps

6. Waltons Parade, Preston
What: Road closed Why: Work Details / Remit - There are mature trees growing from the wall causing root action. Missing brickwork and spalling has been reported to the retaining portion of the wall. These works are to co-inside with line blocks. 08:00 - 17:00 (Network Rail Infrastructure Ltd) When: Oct 26-Oct 30 | Google Maps

7. North Road, Preston
What: Temporary traffic lights Why: Install defibrillator / telephone kiosk, connect power and carry out reinstatement. (New World Payphones Ltd) When: Oct 27- Oct 28 | Google Maps

8. Black Bull Lane, Fulwood
What: Temporary traffic lights Why: Open cut excavation required to repair main in the footway (United Utilities Water) When: Oct 27-Oct 30 | Google MAps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

