Lasting between one day and three weeks, motorists are advised to avoid these areas* if they can or plan their journey to give themselves more time.
As there are 48 roadworks beginning between Monday, November 23 and Sunday, November 29 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks in South Ribble you will most want to be aware of this week, including how long they will last.
*For clarification purposes: the road scene captured is as close to where the roadworks are situatated as we can tell from the council’s bulletin.

9. Preston New Road, Samlesbury
What: Temporary traffic lights Why: Excavate to replace existing water main with new main using open cut method of practice (United Utilities Water) When: Nov 23- Dec 18 | Google Maps

10. Fox Lane, Leyland
What: Temporary traffic lights Why: X1 GAS SERVICE DISCONNECTION REQUIRED - EXCAVATION OF 1M WILL BE N PUBLIC FOOTWAY (Cadent) When: Nov 24- Nov 26 | Google Maps

11. Brownedge Road, Lostock Hall
What: Temporary traffic lights Why: Excavation in adopted and private land to deloop existing looped electricity supplies to support low carbon technology e.g. car chargers, solar panels, heat pumps. This will include the disconnection of an old shared service cable & installation of new individual service cables to multiple properties. Works will involve excavating to identify the mains cable & shared cable, testing, laying new service cables, internal property upgrades and meter relocation, followed by backfill & reinstatement. (Electricity North West Limited) When: Nov 24- Dec 1 | Google Maps

12. Bristol Avenue, Farington
What: Temporary traffic lights Why: Excavate joint bay in the footway and carriageway with approximately 23 metres of track to install and joint cable for new service connection to car charging point located on private land.(Electricity North West Limited) When: Nov 24- Dec 2 | Google Maps
.jpeg?trim=0,0,0,0&crop=&width=640&quality=70&enable=upscale)

