Lasting between one day and two weeks, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 136 roadworks beginning between Monday, February 3 and Sunday, February 9 we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Multi-way signals
Why: [New service connection] Excavate large joint bay (approx 8mx2m) in the footway to disconnect and remove old link box, and to install and joint cables for new link box installation.
When: Feb 4- Feb 10](https://www.thestar.co.uk/jpim-static/image/2025/01/31/20/29/Wheatfield-Leyland.jpeg?crop=4:3&trim=&width=800)
9. Wheatfield, Leyland
What: Multi-way signals Why: [New service connection] Excavate large joint bay (approx 8mx2m) in the footway to disconnect and remove old link box, and to install and joint cables for new link box installation. When: Feb 4- Feb 10 | Google Maps
![What: Multi-way signals
Why: [Utility asset works] BLOCKAGES - Excavate onto BT ducts for the clearance of duct blockages in FW to facilitate spine cabling works.
When: Feb 5- Feb 7](https://www.thestar.co.uk/jpim-static/image/2025/01/31/20/09/Croston-Road-Farington.jpeg?crop=4:3&trim=&width=800)
10. Croston Road, Farington
What: Multi-way signals Why: [Utility asset works] BLOCKAGES - Excavate onto BT ducts for the clearance of duct blockages in FW to facilitate spine cabling works. When: Feb 5- Feb 7 | Google Maps

11. Watling Street Road, Fulwood
What: Two-way signals Why: Reactive Patching Works When: Feb 5- Feb 7 | Google Maps

12. Broadgate, Preston
What: Road closure Why: carriagway surface dressing patching works When: Feb 5- Feb 7 | Google Maps


