Kirkham stormwater project boosts Wrangway Brook water quality

A £5.5m stormwater tunnel in Kirkham is enhancing water quality ahead of schedule.

A £5.5m project to create a new underground stormwater storage tunnel in Kirkham is helping to improve water quality after work was completed ahead of deadline.

 'Betty' the tunnel boring machine which dug the 300m stormwater storage tunnelplaceholder image
'Betty' the tunnel boring machine which dug the 300m stormwater storage tunnel | United Utilities

The 300m long tunnel has been constructed four metres below ground and can store more than two million litres of stormwater – the equivalent of around 26,000 bathtubs.

By giving Kirkham’s wastewater network additional capacity, it will play an important role in improving water quality in nearby Wrangway Brook, a tributary of the River Ribble, by reducing the number of times that storm overflows operate.

As a thank you to the local community, United Utilities has also planted fruit trees along Remembrance Way which is a green open space for walkers and cyclists, and within the ‘Grow to Give’ allotment which provides produce for a local food bank.

Simon Holding, County Business lead for Wastewater Services in Lancashire explained: “We’re pleased to see the tunnel is already delivering environmental benefits by holding back excess stormwater in times of heavy rainfall.

Support your Lancashire Post and become a subscriber today

Enjoy unlimited access to local news, the latest football stories and new puzzles every day. With a digital subscription, you’ll see fewer ads, get faster load times, and access exclusive newsletters and content

“Wastewater from Kirkham travels through the sewer network to the pumping station at Freckleton before going on to the Wastewater Treatment Works at Clifton Marsh, Preston. Creating this extra capacity means that it isn’t all hitting either the pumping station, or the wastewater treatment works all at the same time.

“This means the system is less likely to be overwhelmed and will reduce the number of times that storm overflows operate – which is something our customers have told us they want to see.”

The project is part of the largest investment in water and wastewater infrastructure in the North West for a century.

United Utilities is investing more than £13 billion to protect and enhance over 500 kilometres of rivers, lakes, and bathing waters, while safeguarding drinking water supplies for millions of customers.

News you can trust since 1886
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice