Lasting between one day and one month, motorists are advised to avoid these areas if they can or plan their journey to give themselves more time.
As there are 110 roadworks beginning between Monday, March 3 and Sunday, March 9, we have only listed those involving closures, stop/go boards and temporary traffic lights.
So take a look at the roadworks you will most want to be aware of this week, including how long the work is scheduled to last and why:
![What: Two-way signals
Why: [Highway repair and maintenance works] Bridge inspection using MEWP in 2 way TTL's closure.
When: Mar 4-Mar 4](https://www.thestar.co.uk/jpim-static/image/2025/02/28/14/00/Fernyhalgh-Lane-Haighton.jpeg?crop=4:3&trim=&width=800)
9. Fernyhalgh Lane, Haighton
What: Two-way signals Why: [Highway repair and maintenance works] Bridge inspection using MEWP in 2 way TTL's closure. When: Mar 4-Mar 4 | Google Maps
![What: Two-way signals
Why: [Utility repair and maintenance works] To repair an existing copper cable to restore service.
When: Mar 4-Mar 4](https://www.thestar.co.uk/jpim-static/image/2025/03/02/9/22/Roach-Road-Samlesbury.jpeg?crop=4:3&trim=&width=800)
10. Roach Road, Samlesbury
What: Two-way signals Why: [Utility repair and maintenance works] To repair an existing copper cable to restore service. When: Mar 4-Mar 4 | Google Maps
![What: Two-way signals
Why: [Utility asset works] FW6 CHAMBER OVER EXISTING, SD1 CAB, SDi CAB FW4
When: Mar 4-Mar 6](https://www.thestar.co.uk/jpim-static/image/2025/03/02/9/30/Longmeanygate-Leyland.jpeg?crop=4:3&trim=&width=800)
11. Longmeanygate, Leyland
What: Two-way signals Why: [Utility asset works] FW6 CHAMBER OVER EXISTING, SD1 CAB, SDi CAB FW4 When: Mar 4-Mar 6 | Google Maps
![What: Multi-way signals
Why: [Utility asset works] Approx 292m Gas Mains Replacement with 16 associated services
When: Mar 4-Apr 1](https://www.thestar.co.uk/jpim-static/image/2025/03/02/9/37/Croston-Road-Farington-Moss.jpeg?crop=4:3&trim=&width=800)
12. Croston Road, Farington Moss
What: Multi-way signals Why: [Utility asset works] Approx 292m Gas Mains Replacement with 16 associated services When: Mar 4-Apr 1 | Google Maps


