Lancashire engineering team bridge the gap for city

A Bamber-bridge engineering firm has completed the heavy lifting needed to solve a traffic jam spot in the region.
Watch more of our videos on Shots! 
and live on Freeview channel 276
Visit Shots! now

Eric Wright Civil Engineering has installed a new foot and cycle bridge spanning the A57 Hyde Road in Gorton, Manchester, one of the main routes into the city centre.

The works form part of a £5.9m investment by Manchester City Council to reduce traffic congestion on the busy A57 Hyde Road where the bridge and its abutments form a pinch point, reducing four lanes of traffic to two. Work is due to complete before the end of the year.

Hide Ad
Hide Ad

The installation of the 26 tonne, pre-fabricated steel footbridge was witnessed by representatives from Manchester City Council and the wider project team.

The Eric Wright team working on the bridgeThe Eric Wright team working on the bridge
The Eric Wright team working on the bridge

In March the Eric Wright team lifted out the old 36 tonne railway bridge which formed part of Fallowfield Loop walking and cycleway which spans the A57.

Councillor Angeliki Stogia, from Manchester City Council said: “The Fallowfield Loop path is an extremely important active travel route for people on foot and on bikes.

"The new bridge will ensure that this green route remains in place for generations. In addition, the bridge replacement scheme will reduce the congestion which has blighted this area for too long, impacting not just on commuters whose journeys are delayed, but also on Gorton residents in terms of diminished air quality.”

Hide Ad
Hide Ad

As part of its social value commitment to the local area Eric Wright Civil Engineering was to have offered local apprenticeships on the scheme, however, Covid-19 restrictions meant this was not possible.

The bridge in Gorton is moved into placeThe bridge in Gorton is moved into place
The bridge in Gorton is moved into place

Instead a donation of £10,000 was made by Eric Wright to local charity Read Manchester, an initiative which aims to connect Year 6 pupils with secondary school pupils through a shared reading programme.

Diane Bourne, Eric Wright Civil Engineering managing director added: “It is a real achievement that the team has been able to reach this significant milestone on time, working under Covid secure site conditions since March.

"We have had to really step back and find new ways of working which has been both challenging and exciting at times, especially with the dreadful weather during the lift. It’s great to see the bridge open and we look forward to the completion of the remainder of the works in the coming months.